Skip to content
SprecherEast
Issue 1213

docs: Plan page brief: record the chosen design

Back to our plan
Done
documentationfrontendpriority: low

Summary

Record the chosen design of the plan page in its brief, so the epic's last acceptance item is met and the next person starts from what was decided.

Details

Owner direction (2026-11-14, voice): finish the brief and close the epic. The design is built and live: three graphs over four weeks, a four-week activity map with a caption and key, a day filter with pills, and missions with projects. Opened-versus-finished on the map squares is parked as not planned (owner, 2026-11-14): the pills already show both counts and the map stays finished-only.

Native first: this is a doc edit in docs/product/briefs/plan-page.md; no new file.

Acceptance criteria

  • Not done: The brief records the design that was chosen and how the day filter behaves, as principles, not pixel values.
  • Not done: The parked opened-versus-finished idea is noted with its reason.
  • Not done: Behavior change: none with a true reason; epic #1188 closes with this issue.

Files likely touched

docs/product/briefs/plan-page.md

Must not touch

Code, the roadmap note and generated references.


Generated by Claude Code, opens in a new tab

See it on GitHub, opens in a new tab