Skip to content
SprecherEast
Issue 271

enhancement: Validate local intelligence sources and define the first approved feed registry

Back to our plan
Done
enhancementcmstoolingpriority: high

Type

enhancement

Problem

The neighborhood-intelligence plan (#255; part of news/events epic #161) contains valuable existing research but lacks a tested source inventory that an inexpensive daily collector can trust. Some URLs in the March research are web pages or RSS directories, not confirmed RSS endpoints. An agent must not guess a feed URL or scrape a login-required service.

Owner priority (2026-10-22): make the Sprecher East Community Intelligence System part of the earliest practical backlog/sprint work. The first deliverable must be small, independently reviewable, and reusable by the eventual collector.

Proposed fix (one docs/config-focused PR, target M = 1–2 days)

  1. Reconcile existing source leads without duplicating research:
    • docs/guidelines/content-marketing.md (news, RSS, city and social monitoring lists).
    • docs/custom-skill-proposal.md (Legistar city-meeting API POC).
    • docs/roles/events-mgr.md and existing local resources in src/endpoints/seed/data/resources.ts.
    • Private strategy repo issue #5 only for authorized team members. Do not copy private strategy/social research or resident content to this public issue/repo.
  2. In a concise, versioned docs/intelligence/sources.md (or appropriate existing folder), inventory up to 10 public/authorized starting candidates, favoring Legistar meetings, City of Madison/District 16, Madison Parks/Door Creek, Pinney Library programs, Dane County, local media feeds and first-party public/authorized Discourse. Keep a record of candidates that fail verification.
  3. For each candidate record: canonical source URL, actual feed/API URL if found, type (RSS/Atom/ICS/JSON/HTML), owner, scope, intended audiences, source reliability, rights/access limits, polling cadence, last check date, result (valid/invalid/restricted/pending), recommended treatment, and a recent example item when found.
  4. Actually check the responses and freshness of 5–10 candidates; verify content type, timestamps, duplicates and local relevance (including unrelated places with similar names). Cross-check ambiguous civic facts against the original government record.
  5. Flag the legacy District 17 monitoring references versus District 16 and inconsistent school assignments; do not silently apply broad district/school claims to every home.
  6. Recommend the smallest no-cost/low-cost 3–5 feeds/APIs for a daily dry-run; describe next code issue dependencies. Use existing/native capabilities first (#270; development guideline).
  7. Document that Nextdoor, login-required Facebook groups and other social monitoring are out of scope for automated pilot intake until permissions/access are approved; don't use personal login scraping.

Acceptance criteria

  • Not done: 5–10 source candidates individually tested, with date, link, access/type, response/freshness and success/failure recorded.
  • Not done: First 3–5 low-cost sources ranked for automatic intake, with explicit reasons and permitted access; at least one structured official civic source and one local activity source.
  • Not done: Historical URLs are not silently treated as working RSS feeds.
  • Not done: District 17/school mismatches documented for correction with primary references.
  • Not done: No hidden/private social data or secrets copied into this public issue or repo.
  • Not done: First follow-on collector task linked with clear prerequisites.
  • Not done: One docs-focused PR, independent review and required checks, then merge following AGENTS.md.

Planning and dependencies

  • Parent epic: #161 (create the actual GitHub sub-issue relationship using the project-tracking skill if missing; connector-created issues cannot set parent directly).
  • Strategic/implementation umbrella: #255.
  • Milestone: #1 Ready for neighbors, due Nov 30, 2026.
  • Sprint target: first available week starting Oct 26, 2026, after current critical issues; agent/board planner controls final Ready/Sprint placement.
  • Suggested size: M (1–2 days); board size field must be set by an agent with GitHub Projects access. No owner decision or other blocking task required for this discovery-only work.
  • Definition of Ready: Acceptance criteria and scope above are complete; once linked as actual sub-issue and sized, move to Ready. Do not overrun the planned time: move nonessential sources to later task.

Area

tooling, cms

Priority

priority: high


Requested by owner in chat on 2026-10-22. This task prepares sources; it does not authorize social scraping, automatic publication, or changes to production.

See it on GitHub, opens in a new tab