Skip to content
SprecherEast
Issue 530

enhancement: Move the Milwaukee Street guide to News, tighten it, and shorten the event page

Back to our plan
Done
enhancementcmspriority: high

Problem

In plain words: the Milwaukee Street interchange guide on the Nov 10 event page has grown into a full news story, but it's too long, repeats itself, and buries the real trade-off. The old news post on the same topic (/posts/wisdot-i39-corridor-hearings-2024) is from July 2024, is outdated, and uses an unrelated tennis-court photo.

Summary of the owner's feedback (2026-10-31, Claude in Chrome side panel, text):

Tighten the article's content and structure, because it feels too long, fragmented and repetitive. Show the real trade-off: easier interstate access could help the whole neighborhood, but more traffic, noise and possibly pollution could fall unevenly on households near Littlemore Drive, Western Heights and the proposed ramps. Consolidate the points into three meaningful takeaways and cut the visible text by roughly 30 to 40 percent. Move the article to the news section, then update the event page so it carries a more summarized version. Drop the tennis image in favor of the highway image showing the I-94 signs. Publications stay subject to approval.

Proposed fix (content only, no code)

  • Rewrite the story into the existing news post (id 2): proposed → why it matters → benefits and concerns → status → what's next → how to take part.
  • Key facts block cut from six cards to three takeaways; money details kept but moved down and shortened.
  • Reuse the existing blocks (key facts, timeline, outcome fork, steps) and the WisDOT diagram exactly as they are (same image, caption, legend, order).
  • Hero image on the post: the event's I-94 signs photo (media 10) instead of media 1.
  • Event page: short summary, the diagram, three takeaways, how to join, link to the news story.
  • Both saved as drafts in Payload; nothing is published until the owner approves.

Acceptance criteria

  • Not done: A resident can tell in ~30 seconds what's proposed, who gains, who may bear the costs, what's decided, what's not, and what's next.
  • Not done: Every claim keeps a source link and is labeled confirmed, estimate or unknown.
  • Not done: Visible text down roughly 30–40% from the current event article.
  • Not done: Diagram and its legend unchanged; post hero is the I-94 signs photo; event and post share it.
  • Not done: Both drafts previewed on phone and desktop; owner approves before publishing.

Area

cms

Priority

priority: high


Generated by Claude Code, opens in a new tab

See it on GitHub, opens in a new tab