Skip to content
SprecherEast
Issue 578

Epic: What's happening around Sprecher East (neighborhood updates)

Back to our plan
Open
enhancementfrontendcmsuxpriority: high

Problem

In plain words: neighbors want to know what's going on around them right now: a road that's closed, a business that just opened, a big community event, a public project in the park. The site has news posts and events. It has nothing short and time-bound that shows up while it matters and then steps aside by itself. Tags also get mixed up between kinds: the I-94 story was tagged "Meeting" (#575).

Summary of the owner's request (2026-11-02, Claude conversation, text): the website should include things going on nearby. For example, a nearby highway was briefly closed for private work, which inconvenienced people who arrived and found they could not get through; that belongs in a suitable section. A bank also just opened next to Quick Trip within Sprecher East, and he wants it announced. Major events at churches such as Door Creek Church should probably be added, especially inclusive or major ones. A storm siren is also being installed in Door Creek Park, and he wants neighbors kept up to date on projects like these. The scouts or other agents we keep running through Claude for now need this information too, and a meeting should not be labeled as an information article or blog, as happened with the I-94 interchange. (Speech to text: "Spreaker East" is Sprecher East. "Dork Creek" is probably Door Creek: see below.)

Today (checked):

  • Shared tags. Posts (src/modules/news/cms/posts.ts) and events (src/modules/events/cms/events.ts) share one category tree (#362).
  • Scheduled publishing. Both have Payload's native scheduled publish and unpublish (versions.drafts.schedulePublish: true). The jobs run every minute, and pages re-render within 10 minutes (docs/project.md, decision 0011).
  • Events are one day. An event has one day (date, day only) and text start and end times, so a closure that lasts several days doesn't fit.
  • No time-limited notice. Nothing on the site shows one. The shared Alert (src/platform/ui/Alert.tsx) has info, success, warning and error tones.
  • Home page. It is built from page blocks, including "Events this week" (eventsThisWeek) and "Top issues" (topIssues).
  • Agents. The draft step chooses only events or posts (intelligence/prompts/draft.md).

Examples the owner gave. None is confirmed yet; confirm each before anything is published:

  • Highway closure. A nearby highway was closed for private work. #536 records an earlier mention (2026-10-31): near East Towne, possibly Commercial Avenue. Confirm the road, who closed it, the dates and the detour from City Traffic Engineering or WisDOT.
  • Bank opening. A bank "just opened next to Quick Trip". "Quick Trip" is probably Kwik Trip, the Wisconsin chain (an inference, not checked). The bank's name, address and opening date weren't found. Confirm them from the bank's own page.
  • Church events. Events at "Dork Creek Church". This is probably Door Creek Church, 6602 Dominion Dr, Madison 53718 (GuideStar profile). A Door Creek Church on the north side also exists (Madison365), so a draft must name the location. Whether the Dominion Dr address is inside Sprecher East wasn't checked: check it on the City's neighborhood map, which intelligence/coverage.md names as the authority.
  • Storm siren. A siren going in at "Dork Creek Park". This is probably Door Creek Park, the area's eastern edge in coverage.md. No source for this siren was found. Past siren installs were announced by Dane County (2017) and the City (2019), at other places. Confirm with Dane County Emergency Management or the City.

Proposed fix

One sub-issue per pull request, in this order, after #571 to #574:

  1. One written rule: event, article, neighborhood update or resource (and which tags go where)
  2. Neighborhood updates: a short post type with "from" and "until" dates
  3. "Happening now" strip on Home, News and Events
  4. A page to browse updates, current and past
  5. Local Scout drafts the new kinds of local information as the right kind
  6. Subtle motion that helps reading
  7. "New since your last visit" marks (device only)
  8. Decide: a weekly email (needs the owner)

Decided here: where updates live. This is a technical choice, so it isn't an owner question:

  1. Posts with a "Post type" (chosen). Updates reuse what posts already have: the review queue, the agents' submitSuggestion, search, SEO, preview, cards and cache refresh. That leaves a select and two dates to add.
  2. A new collection (rejected). It would copy all of the above for three fields.
  3. Events with a flag (rejected). An event is one day you can attend. A multi-day closure or a bank opening isn't one, and it would fill the events list and its filters with things that aren't events.

Expiry. Updates don't use scheduled unpublish to disappear: that would also remove them from the archive. The strip shows an update only between its dates, and it stays readable on the Updates page.

Native first, one line per step:

  1. Native: Payload select and date fields, admin.condition, field validate, date where queries, the search plugin that already indexes posts, and Next's 10-minute re-render.
  2. Official plugins: none needed. I found no official notice or alert plugin, but I didn't check the whole @payloadcms/* list.
  3. Open source: not needed.
  4. Our code: the fields, one query and one strip component in the news module.

Milestone 1 "Ready for neighbors". A road closure shown while it's happening is what makes the site worth promoting. #161's outcome is "this week's events, the latest civic update ... in one click".

Priority before promoting:

  1. Must land: #571 to #574 (reading the first screen), then 1 to 3.
  2. If time allows: 4 to 6.
  3. Not needed for the launch: 7 and 8.

Related: #536 (the road-closure post, moved under this epic as its first update), #576 (tags), #575, #161, #255, #390, #537 (neighbor stories, a source of business news), #502 (road diagrams). The first PR adds this epic to the milestone 1 table in docs/product/roadmap.md.

Acceptance criteria

  • Not done: Every sub-issue is closed or decided.
  • Not done: On the home page, at the six widths (320, 430, 768, 1024, 1280, 1920) in light and dark mode, a current update shows in "Happening now". It is gone from the strip within 10 minutes after its "until" time, and it is still listed on the Updates page.
  • Not done: At least one real update is published (#536 or another of the owner's examples), with every fact confirmed from an official source linked in the text.
  • Not done: The roadmap table lists this epic.

Area

frontend, cms, ux

Priority

high


Generated by Claude Code, opens in a new tab

Issues in this epic

See it on GitHub, opens in a new tab