Skip to content
SprecherEast
Issue 596

feat: Public projects: where the money came from, what's built, and its posts and events

Back to our plan
Open
enhancementfrontendcmsmigrationpriority: medium

Problem

In plain words: "Where does my money go?" is answered best with real things: the new Door Creek Park pavilion, a traffic signal, a school renovation. Each project has a cost, where the money came from, a status, a timeline and a place. Over time it also gets news posts and events (an input meeting, a grand opening). Today a post can describe a project, but nothing ties the money, the project, its posts and its events together.

Summary of the owner's request (2026-11-02, Claude conversation, text): tie it to real construction, events and planning. For example, how the siren installation at Door Creek is put together, and how the Door Creek pavilion is funded and what the property tax contributes to it.

Today (checked):

  • Nothing to hold a project. There's no project collection. Posts and events share one category tree.
  • The first project, verified. City Parks project "Door Creek Park Shelter":
    • a 4,000 sq ft multi-season shelter, designed with Aro Eberle Architects
    • Urban Design Commission approval 2022-02-23
    • bids opened 2023-06-22, contractor C.G. Schmidt, start-work letter 2023-08-21
    • "substantially completed" (update of 2025-09-04)
  • Its opening, verified. The pavilion page (7035 Littlemore Dr.) lists a grand opening in February 2026. The District 16 alder's post (2026-02-24) says the shelter opened.
  • Its money:
    • From the media: $3.5 million including basketball and futsal courts, "funded by the city's capital budget" (Cap Times, 2025-03-13).
    • Official, partial: the 2026 Parks capital budget lists project 14334 only in its carryforward borrowing table ($189,664 unused appropriation authority).
    • Not found: the full funding mix. The capital budget's sources include general obligation borrowing (repaid from the operating budget, which property tax funds), impact fees, donations and federal money. Which applied to this shelter is unverified.
  • The siren: no official source found. It isn't added until one is.

Proposed fix

A projects collection in the module the architecture rules point to (likely a new civic module). Fields:

  • title, summary, kind (park, street and traffic, school, utility, safety, other)
  • status (proposed, approved, funded, under construction, done)
  • lead agency, place (text plus coverage tier), timeline (reusing the Timeline block's shape)
  • funding rows: source type, amount, budget year, certainty, sources
  • total cost with its certainty, and official links

Every money value follows 01.

Joins:

  • posts and events get an optional "Related project" relationship
  • the project shows them through Payload's join field (Payload v3; confirm in llms-full.txt before building)

Project page:

  • the summary, a funding chart (03) and timeline, related posts and events
  • a "What we couldn't confirm" list taken from the unknowns

Not in scope here: agents drafting projects. submitSuggestion only takes posts and events, so agents suggest a post that names the project, and an editor creates or links it. Extending the tool is a later issue.

Native first, one line per step:

  1. Native: a Payload collection, relationship and join fields, drafts, versions, the existing Timeline and Key facts shapes.
  2. Official plugins: none needed (nested docs isn't relevant).
  3. Open source: none needed.
  4. Our code: collection, mapper, page route, tests.

Acceptance criteria

  • Not done: An editor can create a project with funding rows and link posts and events to it. The project page lists them.
  • Not done: The Door Creek Park pavilion exists as the first project. Each fact above is marked confirmed, from the media, or unverified, as listed.
  • Not done: The access policy test covers the new collection (accessPolicy.test.ts). The migration runs up and down.
  • Not done: The project page passes the visual review at the six widths, light and dark.

Area

cms, frontend, migration

Priority

medium


Generated by Claude Code, opens in a new tab

See it on GitHub, opens in a new tab