Skip to content
SprecherEast
Issue 721

process: Leaner agent team — chief of staff, one worker per issue, a fresh reviewer; roles and helpers as skills; knowledge layer first

Back to our plan
Done
processtoolingpriority: high

Type

process

Summary

Record the leaner shape of the agent team that the owner chose on 2026-11-06, and the new order of work: the knowledge layer first, the agent team after. The written plan (the operating model page, the work-in-progress rule and the pages that quote them) is updated to match. Nothing is built here.

Problem

The operating model merged on 2026-11-05 (#692) describes three levels: a chief of staff, four standing helpers, and twelve role agents grouped in departments, with a cap of 2 issues in progress. Two outside reviews and a check against published research on 2026-11-05 and 2026-11-06 found the organization heavier than the evidence supports:

  • Multi-agent work uses about 15 times the tokens of a chat, and coding has less parallel work than research (Anthropic, opens in a new tab).
  • In a test of 180 agent setups, several agents helped parallel work by up to 81% and hurt step-by-step work by 39 to 70% (Google Research, opens in a new tab).
  • What works in practice: a manager that splits work, read-only helpers, and a reviewer that starts with no shared context. Several writers working in parallel on the same thing still don't (Cognition, 2026, opens in a new tab; 2025, opens in a new tab).
  • The twelve role agent files differ only in which role guide they point to. A role guide is knowledge and checklists, which is what a skill is for; a separate agent is for isolated side work (Claude Code, opens in a new tab).
  • Every part of a harness encodes a guess about what the model can't do, and is worth re-testing (Anthropic, opens in a new tab).
  • The 16-agent compiler project often cited for parallel agents had no orchestrator and relied on independent tasks and a near-perfect test suite, not on a fixed number of agents (Anthropic, opens in a new tab).

Summary of the owner's direction (2026-11-06, Claude session, text)

  • The knowledge layer is built first. Building the agent team waits until it is done.
  • The team is leaner: one chief of staff he talks to, one temporary worker per issue, and a fresh reviewer per pull request.
  • The twelve role guides become skills a worker loads. The four planned helpers (planner, design lead, review lead, process analyst) fold into the chief of staff's skills.
  • More agents are added only if this proves too thin.
  • Parallel work has no fixed number: whether issues touch the same files decides (his decision of 2026-11-04, confirmed).
  • The visual plan page is updated to match.

Proposed fix

  1. docs/process/agent-operating-model.md: the leaner model (who gets a session, what is a skill, when to add an agent), the new order, and the sources above. The scrutiny levels, the reviewer rules, the issue flow and the feedback loop stay as they are, apart from naming who runs them.
  2. docs/process/project-management.md: the work-in-progress rule has no fixed number; the overlap check, the shared hot spots and blockers decide.
  3. The pages that quote those two: AGENTS.md (one phrase in step 1), CLAUDE.md (the agent-team note), .agents/skills/project-tracking/SKILL.md (two mentions of the cap), docs/roles/README.md (one sentence).
  4. docs/product/roadmap.md: the knowledge-layer epic and this epic in the "No milestone" table.
  5. On GitHub, not in the PR: #685, #695, #696, #697 and #698 are updated to the leaner design, and #695 is marked blocked by the knowledge-layer epic.

Acceptance criteria

  • Not done: The operating model shows three kinds of session (chief of staff, worker, reviewer), lists the role guides and the helper duties as skills, and says when an agent may be added.
  • Not done: It says the knowledge layer comes first and names its epic.
  • Not done: No page still mentions a cap of 2, a standing helper layer or departments as agents.
  • Not done: The scrutiny levels, the claim step and the reviewer rules are unchanged.
  • Not done: Every changed file is under 250 lines and Prettier passes.
  • Not done: The review lists this as a policy change the owner asked for and checks it stays within the summary above.

Files likely touched

docs/process/agent-operating-model.md, docs/process/project-management.md, AGENTS.md, CLAUDE.md, .agents/skills/project-tracking/SKILL.md, docs/roles/README.md, docs/product/roadmap.md.

Must not touch

src/, .claude/agents/ and .claude/skills/ (the agent files change when #695 is built), .github/, docs/guidelines/.

Open questions

None.

Area

tooling

Priority

high


Generated by Claude Code, opens in a new tab

See it on GitHub, opens in a new tab